DWV Rough-In Basics: Sizing, Slope, and Venting
Drain-waste-vent systems fail silently at first — slow drains, gurgling, and sewer gas before anything backs up visibly. Getting the rough-in right means understanding the three variables that govern every DWV system: pipe size, slope, and vent configuration.